I am putting together a larger system for a customer. 390TB of storage for 18 months of retention. There is no engineering firm here. I am engineering this myself. Sitting at 4000 watts and 13000 BTU/h with UPS power. I am taking into consideration the following but just looking to cover bases with some advice from fellow IPVM friends:
- Rack U space
- Cooling
- Standard and UPS power
- Grounding for static electricity
KVM console
Anything else you can think of? Thanks.