Subscriber Discussion

Has Anyone Ever Installed A UPS On A Branch Circuit Instead Of At The Device It Is Backing Up?

UI
Undisclosed Integrator #1
Apr 26, 2023

In this case, is there such a UPS that can be hardwired and placed in between the circuit breaker for a branch circuit that is only serving to be the 115vac mains feed into a couple of Allegion PS914 power supplies that are powering electrified panic devices?

The customer wants to have back up power at these two doors but the two ELR doors require much more than a couple of 12AH batteries can provide at the door! There isn't an emergency generator on site unfortunately, but the power requirement of an ELR door are such that I'm not sure how to really provide full operation in the event of a power failure. The rest of the system is normal prox card readers, single door IP-based controller .. nothing special there.

UI
Undisclosed Integrator #1
Apr 26, 2023

**, *** * ******* ***** ** info ... *** ***** ******** *** mounted ** *** *****, *** ** the ********** *****/

Avatar
Brian Rhodes
Apr 26, 2023
IPVMU Certified

*'* *** **** *** ** ****** provide **** ********* ** *** ***** of * ***** *******.

** ***** ******* *** ******* ** the **** *******? ***** *** ***** that, **** ********, ******* *** ******* mechanically.

** ***, *'* ****** *********** ****** that ****** *****. ****** ***** ** entire ********* ** ***** ** *** expensive, ** * *********** ***, *** might ***** ** *** ** **** concerns ** **** ***** ***** *** vulnerabilities ** **** *********.

(1)
UI
Undisclosed Integrator #1
Apr 26, 2023

****** *** *** ***** *** ******. They *** ****** ** ******* ********** access ******* ***** ***** ** *** event ** * ********* ***** *** or ***** *******. *** ********* **** have ******* ** *** ** *** in ***** *****. * ********* **** the *********** ***** ***** **** ******* and *** **** *** ****** ******* but **** ***'* **** ** ***** the **** ************ ******** *** *** amount ** **** ****** *** ***** is *** *** ** ******** ****** of ****, *** **** **** * hours.

* ****** ** *** *** **** of ***** ********** ****** *** *** datasheets **** **** ****** ** *****, so **'* ******** **** **** **** I ******* **********. ** *'* *** a ******* ****** ******, *** ** this * *** ** ***** ** true *** ***** ******* ** *** panic ****** *** ** **** ******** when *** *** ** ******** (****** a *** **** ********* ******** ***** to **** ******) * ***** ******** get ***** * *** ********** **** a **** *******/*******, ******* *** ** them. *'** **** ** **** **** at *** **** ******** ***** *'* sure *** **** * ******* ****** tutorial ** *****!

Avatar
Jason Neubauer
Apr 26, 2023
IPVMU Certified

* *** * ******* ********* **** up *** ***** ***** ** ******** and * *** ** ** *** best *****.

******** ******** ** ***

(1)
Avatar
Brian Karas
Apr 26, 2023
Pelican Zero

**** **.

*** *** ****** **** ** ** the **-** *** **** ***********, *** that ** ************.

*** **** *** **** ** **, I ******* *** *** ***** ** need ** **** * ******* ******* the ***, ** **** ***** ** the ****** ******** *** ** ***** disconnected *********. * ******* ****** *** UPS (***** *** **** **** ****) would *** *** ***** ** *** circuit *******, ***** *** *** ***** see **** ** * ***** ****** and ***** ****** ** **'* ***.

*** ******** **** ** **** ** your *** ***** ** *** **** would ** ********** ** ********** ********. There *** * *** ********* *********, but *** **** **** **** ** something *** ******* ******** ** *** AHJ ***'* **** **.

MF
Mario Fernandez
Apr 26, 2023

*** ***'* ******* **** **** ** ELR ** ***** ****. ** ** is ******** *****, ** ******** ~***** inrush ** ********** *** *.**** *******. If ** ** ***** ***** ***, all ** ******** ** * ~ 3 **** ** ******* *** *.** ~ *.* **** ******* ********* ** brand *** *****. **** **** ** being **** **** ****** ******* ******* time, ****** ********.

*** ***** *** * ******* ****** kit ********* *** ** **** ******** either *** ****.

*** **** ****** *** **** ** Von ****** ***-*** *** **** ******** the ***** *** *** ******* ****. We **** **** **** **** ***** with ***** *******.

**** ** **** *** ***** ***** Supply ***** ** **** ******* ** 4 **** ** *** ** *** inrush ****** *** *** ******** ***** ELR ** *** ***** ******** ******** by *** ***** ****** ***** ** the ********* *** **** ******. *** 16 *** ****** ** ***** ******** by *** ********* **** *** ***** has *******, ********* *** ********* **** "see" *** "*******" *** * *** power ******.

*********:**** ** ***** * ******* ***** disconnecting *** ** ***** ** *** PS914 ****** *** ***** *** ********* in **, ********** *** ** ***** and *** ********* ***** *** ***** cover ** *** **** ** *** PS *****. ** **** **** ** you ***'*.

* **** **** *****.

(3)
UI
Undisclosed Integrator #1
Apr 26, 2023

****** ***** ... * ******* **** is * ***** ****** ***, *** this ** ***** ** *** **** being ***** *** **** * ******** all ** *** ********* ***** *** info * ***** ****, **** *** listed * *** ** ***** ** the ******* ****. ******* ** ****** like **** **** ** *** *** is * ********-****** ***, **** *** battery **** ** ***** **** *** 900-BBK **** ****, *******?

** *** **** * **** *** how ****/*** **** ****** *** ********* would ********* ******* *** *** ********* of *** ***?

(1)
MF
Mario Fernandez
Apr 26, 2023

** **** *** ******* * ***, it ** ********** ***** ******.

*** *** ***** ******* ****** **** support ******** ***. (** **** **** at *** ** *** *******)

*** **** ****** * ******** ******** two *** *** *********. *** ****** provide ***** *~* ***** ** ******** 1 *** ******* ********* * **% discharge ******. *********** *** *** ******** 1 *** *** *** *** * couple ** ******* ** ** ******, the ********* ****** ** ** ******* a ******* ****** ** ******, ******** the **** **** *** ******* ***** perfect **********.

**** ** **** ******* **** **** bars *** ******* ******** ** *** doors ***** ******** *** ******** ***** will ****** *** ****** ** ****** the ********* *** *******.

*** ***** * ****** ** ******* it **** ** ***** ** ** able ** *** *** ***-*** ** the *****, *** ****** **** **** than * ****** ****** ********* ** the *****.

******

(1)
Avatar
Morgan H
Apr 26, 2023

* **** **** **** **** *****, APC *** ****** **** ********* *** systems **** **** ******* ***** **** this. * ***** **** ******* *** matching **********/****** **** **** ** ** you *** ******* *********** ** *** UPS ** ********** *** **** ** necessary.

** *** *** ** ****** **** the ***** ******* *** *** ******** then *** **** **** **** ** provide ****** * *** ***** **** breakers *** **** ****** *** ** use * ******** *** ********* ** the ***.

** *** *** *** **** ** doing **** *** ** *********** **** does **** *** * ****** ** help *** ***** *** *** *** and ************ *******.

(1)
(1)
Avatar
George Peffer
Apr 28, 2023
PCSystems.BIZ

********* *** ****** *****

* ***** *** * ***** @ 7A ********* ** ******** (***) ** the **** **********/*******, *** ** ********* then * ***. * ***'* ***** you ***** **** * *** *** this *** ***** ** ** ************* that **** ** * ***** **** 1A ****. ** **** ** ***** operating *** ** ** ******** ***** power ******, ********* *** *** **** in **** ****** ***** **** *** never *** * *********. **** **** to ******* ********* ***** *-* *****.

UI
Undisclosed Integrator #2
Apr 28, 2023

*** ********* ** ******** ***** ******* 12V, **** **** ******* *** ********* amperage. ** *** **** *** *** need ** *** *** ********* ** series.

(1)
Avatar
George Peffer
Apr 28, 2023
PCSystems.BIZ

*******. ***, **** ** - ******* gets ****** ** *** ********. * knew **** *** ****'* ******** *** still ****** **!

(1)
UI
Undisclosed Integrator #3
Apr 28, 2023

**** ** ****** *** *** ******** count? ** **, **** ***. **** it.

***'** **** ******* ** **** *** your ***********.

New discussion

Ask questions and get answers to your physical security questions from IPVM team members and fellow subscribers.

Newest discussions