Do you prefer to group your door controllers in a single location - like an IDF or do you install them at the edge on the secured side of the door?
Does client IT actually provide UPS capacity for the door controllers if they are POE+?
**** ** **** **** ***** ** locate * ***** ****** (********, ***) in *** *** *** *** * 16/2 *** ** **** **** **********?
***** ** **** **** *********?
**** ** ********** ******?
** *** ******* ** *** **** secured ****, ********* ** **** (** wired ******** *** **** ** ********* defeats *** *******) *** ******* ** the *****, ***** *** ******** ** our ********* **** ** *********.
***** *** ** **** **** ********* is ****** ********* ** *** ******* location.