Post your update. Axis AE event post caught on. Tomorrow, back to normal.
And if I forget to post this earlier, feel free anyone to post the day's daily update discussion.
Post your update. Axis AE event post caught on. Tomorrow, back to normal.
And if I forget to post this earlier, feel free anyone to post the day's daily update discussion.
Uploaded Install Deck 3 to Lightning, 50 slides & 3 demo videos
Called Sarge, he had to leave but said he'd call me back
Called Shannon D, talked about post topics for him to do as trial post
Started Deck 4 Install class
Added technical details to BCD, reviewed structure, moved a couple parts out of the company overview into smaller/other existing sections. Outlook section needs finalizing, added profile logo, needs meta, set to review
Call with Genetec Mathieu D’Arsigny "Platform Product Director" regarding new/updated features in 5.8, mostly reviewed what was in their blog post. Emailed JP for the licensing, said I would have it today, didn't get it today. Calling him first thing AM to get it. Scheduled a UX review call with Greg for Wednesday, should not have to review a lot, have already gone through most of SC, going to focus on new search features/dashboards.
Call with vintra, reviewed a couple new products, discussed AI tester integration, notes in GH, will talk to Brent about a "non-public" integration
Emails with Andrew @ Genetec about a user that reached out with potential concerns with their integrator in SoCal. Connected user with Genetec West Director and local RSM.
Pendant mount edits for Scanlan, help with a new image or two
pinhole/covert testing, notes in github
Internal discussions re: development issues, themes, etc.
Support emails: membership/upgrade inquiries, refunds, receipts, cancelations, invoicing, login issues, quotes.
Called Divvy to request a credit increase for our ISC West bag sponsorship. They are processing our request now and I'll have more details tomorrow.
Set up Jessica's Divvy budget.
Communication with Seth, Sean, and Tyler regarding flights for ISC West. Will book first thing tomorrow.
2 calls with Ethan regarding firestopping
call with chris regarding entry way / stairs to do
met with Brain (garage door guy) who needed help setting up
he installed the overhead door to close off the test bay
discussions with Jessica regarding courses, axis training, github, divvy, etc
met with Jason (cable pulling guy)
he was here to finish dragging cables for intrusion / access control
they still need to be terminated
chat/messages with Duc regarding offer letter
his adviser approved
I setup a call with Duc to discuss next step
looked into issue of survey results timing out
assigned hint / added new details re: affecting a student
created new issue for exam failing when time expires
emailed student
provided $100 credit
reviewed his submission
tried calling him, but got VM so I emailed him again as a courtesy follow up
his response: "You are too nice! Thank you so much for your support on this!"
call with Ryan re: divvying funds for Seth and Jessica, expenses, and finding a local bank
cut down EMT to get pendant mount component picture in our light box
sent to lighting to mark up
reviewed with Ethan, who made edits
added small news image
flipped report to review
final edits with JH
assigned Jessica to PTO tracking github issue
graded 20 more final exams + ~10 resubmits for the networking class
8 pm call with Duc / he needs to get some paperwork done before working
Seth is off on Friday (birthday PTO)
I am leaving early Friday (father/sons trip for the weekend)
Investigated error user had submitting the final exam. Found related Honeybadger error; will try to duplicate by letting an exam time out on purpose and then attempting to submit results. Looked into student's submission; determined submission actually went through and was saved in our DB, and found way for Scanlan / instructors to view the results. Determined the survey statistics page not loading does not prevent instructors from viewing student responses.
Added profiling gem locally to determine time spent querying DB when loading a view; started going through the statistics page for surveys and determining what takes so long / how to optimize. Each page load makes a lot of queries (the one I looked it made almost 1000 for about 50 students and 50 questions). Began cutting down the number of queries made, hopefully this will help the pages load faster.
Reviewed and approved JH's e-mail change for auto-renew cancellations.
Added more themes, continued testing with team / feedback from everyone.
Created user account for Jessica on staging.
Briefly looked into daily mailer logs, but no webinar reminder emails were sent today, will follow up tomorrow.
Call with JH.
Goals for tomorrow: continue profiling survey statistics page, look at daily mailer logs, decide on a theme?, check out survey submission error, and continue with payment update as time allows.
Friendly reminder: I'm off Friday.
Discussed how we were going to mount the covert cameras for shooting, made the box to hold the cameras, shot WDR, low light, dark, indoor. Some troubleshooting of the March cameras (wouldn't add to VMS,) and Hanwha camera (was dropping every ten seconds)
Call with Deep Sentinel to confirm cameras being shipped back.
Discussion cleanup.
Library results
- All videos being processed
- Added pagination
- Basic D3 charts for avg-accuracy per attribute grouping
Ask questions and get answers to your physical security questions from IPVM team members and fellow subscribers.